Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 10 results ...

Al-Jibouri, S H and Mawdesley, M J (2001) Design and experience with a computer game for teaching construction project planning and control. Engineering, Construction and Architectural Management, 8(05), 418–27.

Bresnen, M and Marshall, N (2001) Understanding the diffusion and application of new management ideas in construction. Engineering, Construction and Architectural Management, 8(05), 335–45.

Charoenngam, C and Sriprasert, E (2001) Assessment of cost control systems: a case study of Thai construction organizations. Engineering, Construction and Architectural Management, 8(05), 368–80.

Chritamara, S, Ogunlana, S O and Bach, N L (2001) Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling. Engineering, Construction and Architectural Management, 8(05), 381–92.

Gil, N, Tommelein, I D, Kirkendall, R L and Ballard, G (2001) Leveraging speciality-contractor knowledge in design-build organizations. Engineering, Construction and Architectural Management, 8(05), 355–67.

Harris, R A and Scott, S (2001) UK practice in dealing with claims for delay. Engineering, Construction and Architectural Management, 8(05), 317–24.

Kululanga, G K and McCaffer, R (2001) Measuring knowledge management for construction organizations. Engineering, Construction and Architectural Management, 8(05), 346–54.

Kumaraswamy, M and Dulaimi, M (2001) Empowering innovative improvements through creative construction procurement. Engineering, Construction and Architectural Management, 8(05), 325–34.

Messner, J I and Sanvido, V E (2001) An information model of project evaluation. Engineering, Construction and Architectural Management, 8(05), 393–402.

Oyegoke, A S (2001) UK and US construction management contracting procedures and practices: a comparative study. Engineering, Construction and Architectural Management, 8(05), 403–17.

  • Type: Journal Article
  • Keywords: compensation structure; construction management; first-tier contractor; management contract; risk and responsibilities distribution; stakeholders
  • ISBN/ISSN: 0969-9988
  • URL: http://www.ingentaconnect.com/content/bsc/ecam/2001/00000008/F0020005/art00222
  • Abstract:
    This study provides a framework for comparing construction management contracts in the UK and the US construction practices. It starts by reviewing previous studies on UK and US contracting practices and explores the main delivery methods, inform of comparison with construction management contracting systems. It examines construction management contracting types, processes and procedures and interaction between the construction manager and other stakeholders. This study was based on a literature review and the result shows the similarities and differences between the American and British CM systems within each practice and between both practices; the distribution of responsibilities and risks both in pre-construction and during the construction stages; and allocation of responsibility in both practices.